Sorry, I'm not a professional builder, so if I have the wrong names for stuff, I hope you'll forgive me.
July 11
Grandpa Ogilvie helped fasten down the base plates
Gary marking a plate board for drilling
July 16
Gary and Tom shooting nails to attach a door frame
this is the ledger board
the top of the door frame
July 17
installing joist hangers
bringing in the joists
cutting off the extra bolt length
July 18
Gary got the joists hung, and now Tom and Ben are here to help with the roof decking
cutting the joists to a uniform length and angle
attaching the rim board
The decking went down quickly. Buffy was here with Ben.
July 22
Next the roofing felt
and the metal roofing
fastening it down. It was a hot sunny day, and this is on the southwest side of the house. You could blister your hand (or knee) if you actually touched the roof
July 31
with the exterior mostly finished (roof trim, etc) . . .
it's time to apply the epoxy paint to the floor inside
August 03: framing the walls:
Aug 4: framing for a roof over the doors
Aug 6 getting power from the garage panel to the new shop
Aug 13 and 14
Can't put off the insulation any longer.
lots to put up
lots of wires to work around, too.
Gary really hates fiberglass.
Aug 22
ready for the sheet rock.
We hired Kip Rupp to do it. He's fast and good.
And this is why we hired him: 8 ceiling cans and lots of boxs in the walls (Pardon the dust in the air).
Taping, and first layer of mud
Aug 27: Yay, Dennis is here, just in time to help paint
That's all for today. Coming up next: moving in.