Thursday, October 15, 2009

Finish the Construction


Sorry, I'm not a professional builder, so if I have the wrong names for stuff, I hope you'll forgive me.
July 11



Grandpa Ogilvie helped fasten down the base plates


Gary marking a plate board for drilling


July 16




Gary and Tom shooting nails to attach a door frame


this is the ledger board


the top of the door frame

July 17


installing joist hangers


The doors are hung, the joist hangers installed. Notice how well it lines up with the deck we will eventually extend. If you are wondering about the car hoods being up, refer back to Debbie's and Dennis' blogs about the pack rat problem


 bringing in the joists


cutting off the extra bolt length

July 18


Gary got the joists hung, and now Tom and Ben are here to help with the roof decking


cutting the joists to a uniform length and angle




attaching the rim board


The decking went down quickly. Buffy was here with Ben.

July 22



Next the roofing felt


and the metal roofing


fastening it down. It was a hot sunny day, and this is on the southwest side of the house. You could blister your hand (or knee) if you actually touched the roof

July 31






with the exterior mostly finished (roof trim, etc) . . .


 it's time to apply the epoxy paint to the floor inside

August 03:  framing the walls:










Aug 4:  framing for a roof over the doors



Aug 6 getting power from the garage panel to the new shop






Aug 7 Red letter day for me. New steps! Better than the old ones. Of course these are also tempory until we can finish the deck, but who knows when that will be?





Aug 13 and 14



 Can't put off the insulation any longer.


 lots to put up


 lots of wires to work around, too.


Gary really hates fiberglass.


Aug 22



 ready for the sheet rock.


We hired Kip Rupp to do it. He's fast and good.


And this is why we hired him: 8 ceiling cans and lots of boxs in the walls (Pardon the dust in the air).


Taping, and first layer of mud

Aug 27:  Yay, Dennis is here, just in time to help paint




That's all for today.  Coming up next:  moving in.

Tuesday, October 13, 2009


Flatwork


July 6:

The pad and steps formed



the back half of the room divided off and wet down



 getting the sono tubes ready


 the tools ready and waiting

 the concrete is here. Tom made this jig to keep the post brackets in position while the concrete sets


back up into the same corner of the yard as before



fill the sono tubes first,




then the floor

preliminary leveling


pouring the steps and pad


this screeding was relatively easy




compared to this


hauling the excess concrete out by ladder and bucket


cleaning the tools




Tom had a lot of troweling to do.

July 8:



 ready to pour the rest of the floor


here it comes






Ben was Tom's helper today


Whaddayamean that's all the concrete? Get up there and scrape out the rest!


just barely enough


screeding around the buried stuff


preliminary smoothing


 final troweling




putting in the date for me


done.


That jig worked very well.



Coming up next . . . you'll see.